Shed - Done

5hrs of Staining later..... Rough Sawn pine looks rustic, but takes a lot of stain.....

Labels:

Friday, June 19, 2009

Shed - 99.9% done






Just some stain to pick out and apply....

Labels:

Monday, June 15, 2009

shed ..... almost done


just a couple battens and one window left to frame and trim

Labels:

Tuesday, May 26, 2009

shed building.... the beginning

Started construction on our 10x16' Board and Batten shed. Stick built from scratch. (yes we have a permit)

2'x2' cement patio stones placed in the 4 corners (79lbs each)

Peter cutting 2x6 stringers for the joists and double header and double rim joists. Jordan riding his jeep in the background (Saturday morning)
Jordan piling scrap wood in his jeep, to take to the backyard
Wood transported to the backyard on our trailer.
Jordan with his jeep towing the wagon

Floor done, walls framed, and now making Roof Trusses (Sunday Afternoon)

Roof trusses up.... (Monday evening)

Labels: